Removal of Deposits from the HP Turbine Flow Path of the 18K370 Turbine at Bełchatów Power Plant

Authors:
Wojciech Majka, Ecol Sp. z o.o., Poland
Charles Danny Foster, Ecol North America LLC, USA

1. Introduction

Bełchatów Power Plant, owned by Polska Grupa Energetyczna (PGE), is the largest electricity producer in Poland. It is a lignite-fired power plant comprising 12 generating units with nominal capacities of 370–390 MW and one supercritical unit with a capacity of 858 MW.

Generating Units 1–12, commissioned between 1982 and 1988, use Dolmel Wrocław GTHW 360 MW synchronous generators (manufactured under a BBC licence) driven by Zamech Elbląg 18K360 steam turbines (manufactured under a BBC licence) to generate electricity.

Following upgrades to the LP sections (retrofits) of all 12 turbines carried out between 1997 and 2004, which resulted, among other things, in an increase in output of 10–12 MW, the turbine designation was changed from 18K360 to 18K370.

The main turbine installed at Unit 10 is a condensing, reaction-type, single-shaft, three-casing turbine with non-controlled steam extractions and intermediate steam reheating. Steam supply to the turbine is regulated using a combined throttling and quality control system operated by four control valves. The turbine consists of three sections: a high-pressure (HP) section, a double-flow intermediate-pressure (IP) section and a double-flow low-pressure (LP) section.

During the operation of turbines at Bełchatów Power Plant, systematic fouling of the flow paths in the high-pressure sections has been observed, characterised by elevated pressure in the control stage chamber. The increased pressure in this chamber indicates the presence of a thick layer of corrosion and operational deposits on the convex surfaces of the blade profiles in the HP blading assemblies.

As the accumulation of deposits leads to a noticeable deterioration in turbine performance, the plant’s engineering staff undertook efforts to identify and implement a method for removing deposits from the turbine quickly and effectively. The objectives set for the proposed solution included selecting a method that would safely remove deposits consisting predominantly of copper and iron oxides during short maintenance outages, without removing the rotor from the HP casing and with the minimum possible scope of dismantling work. The solution selected was proposed by Ecol Sp. z o.o. of Rybnik and involved chemical cleaning of the interior of the turbine’s HP section using chemical foam.

In September 2012, a pilot chemical foam cleaning operation was carried out on the HP section of the 18K370 turbine at Unit 10 of PGE Górnictwo i Energetyka Konwencjonalna S.A., Bełchatów Power Plant Branch. This paper presents the experience gained during the work and the results obtained.

2. The Problem of Deposit Formation in Steam Turbines

In steam turbines, some of the contaminants that pass through the boiler with the steam are deposited on the components of the turbine flow path. Rotor blades and stationary blades have specially designed profiles to ensure the most efficient conversion of steam energy into mechanical energy. As deposits accumulate inside the flow path, its aerodynamic performance deteriorates. This leads to a reduction in efficiency and, in cases of severe channel blockage, restricts steam flow. Achieving the steam flow required to generate the specified output results in an increase in pressure at the turbine inlet (in the control stage). However, this pressure is limited by the turbine manufacturer’s specifications.

The most effective way to prevent deposits from forming in turbines is to eliminate the sources and causes of substances that may lead to deposit formation. In practice, however, this is often very difficult to achieve due to the complexity of water and steam cycle management. Properly planned and executed operation of the boiler and other components of the water and steam cycle can significantly reduce the transport of contaminants with water and steam, but experience shows that it often does not eliminate this process entirely. Deposit formation makes periodic cleaning of turbine flow paths necessary to maintain the required operating parameters. In practice, this has become an almost routine procedure performed during major overhauls.

Deposits accumulating on turbine components may consist of substances that are either soluble or insoluble in water. While the former (e.g. phosphates) can sometimes be flushed out by the flow of wet steam through the turbine, water-insoluble deposits must be removed using other methods. The most common water-insoluble deposits found in turbines include copper compounds, iron oxides and silicates.

Copper compound deposits in turbines generally occur in generating units containing components made of copper alloys. These deposits form during operation when copper ions and compounds dissolve in the feedwater and circulate throughout the system. When transported into the steam, they may precipitate under certain conditions, forming deposits.

Dissolved copper oxides and other metal oxides resulting from corrosion (and/or erosion) of components in the unit’s water and steam system (e.g. condenser tubes, regenerative feedwater heaters, boiler tubes, or fragments of Cu alloys eroded from pump rotor components), as well as contaminants introduced with boiler water, are transported by the steam and deposited in the greatest quantities in primary superheaters and the high-pressure sections of turbines.

Copper may accumulate in metallic form or be deposited as oxides, phosphates and other salts. In addition to their adverse effects on aerodynamic performance, metallic copper deposited on steel components may also accelerate electrochemical corrosion (copper acts as the cathode, while the anode – the iron alloy – undergoes corrosion).

3. Case Study: The 18K370 Turbine at Unit 10 of Bełchatów Power Plant

Operating experience with the 18K370 steam turbine at Unit 10 of Bełchatów Power Plant indicates systematic deposit formation in the high-pressure (HP) section. The HP section of the turbine under consideration retains its original design, which was upgraded in 2004. Fresh steam is supplied to the turbine through four valve assemblies feeding four nozzle segments. During operation, the turbine’s performance parameters progressively deteriorated following its return to service after a major overhaul in 2008. Difficulties arose in achieving full output, with the limiting factor being the requirement not to exceed the permissible pressure of 15.2 MPa in the control stage chamber.

The steam capacity and flow rate through the HP section decreased, and these problems became increasingly pronounced over time. Achieving rated output eventually required shutting off the steam supply to feedwater heater XW7 (the resulting decrease in feedwater temperature is illustrated in Chart 1). The reduction in turbine performance was associated with deteriorating operating conditions caused by deposits on the turbine flow path components. Similar deposits had been identified during inspections carried out on other generating units during previous overhauls. Laboratory analyses showed that the deposits consisted predominantly of copper oxides (approximately 80%) and iron oxides (approximately 20%). These deposits are insoluble in water and therefore cannot be removed by flushing with wet steam.

The water and steam cycle at Unit 10 operated under the “Full Combined Regime”, which involved oxygen dosing into the feedwater, additional independent oxygen dosing into the main condensate (at the suction side of the main condensate pumps), and carbohydrazide dosing into the purified condensate.

Among the components of the water and steam cycle containing copper alloys, the condenser should be mentioned. It is fitted with tubes made of MC70 brass alloy.

An analysis of measurements taken on the turbine showed that the remaining components of the turbine-generator set were operating at their nominal capacity.

Chart 1. Pressure (p) in the control stage chamber and feedwater temperature (T) over time.

A 73.5-day extended intermediate overhaul of Turbine-Generator Set TG10 was scheduled for the period from 27 August to 10 November 2012, including inspections of the intermediate-pressure (IP) and low-pressure (LP) sections. No maintenance work was planned for the high-pressure (HP) section. Since a turbine modernisation overhaul involving replacement of the HP section was scheduled for 2015, and operating measurements indicated a deterioration in the performance of the HP section, a decision was made to carry out chemical cleaning of the turbine using the chemical foam method.

4. Overview of Chemical Foam Cleaning Technology

Chemical foam cleaning is a globally recognised and economically attractive method for removing certain types of deposits from turbine flow paths without the need to open the turbine for cleaning. The entire cleaning process can be completed during an outage lasting from several days to approximately two weeks, depending on the thermal condition of the turbine. Once the cleaning process has been completed, the turbine can be returned to service quickly.

Traditional maintenance methods for removing water-insoluble deposits require a maintenance outage during which the turbine casings are dismantled, the rotor and stationary blades are removed, and components contaminated with deposits undergo abrasive blasting. Although effective, this process is also time-consuming. Taking a turbine out of service specifically for abrasive blasting is generally very costly.

An alternative solution is chemical cleaning using foam. This method does not require turbine dismantling and therefore offers significant cost savings compared with conventional cleaning methods.

The chemical foam cleaning technology used during the TG10 turbine overhaul involves a controlled process of circulating foam, generated from chemicals that dissolve the existing deposits, through the interior of the turbine being cleaned. A schematic diagram of the process is shown in Fig. 1.

Fig. 1. Schematic diagram of the turbine chemical foam cleaning process

The foam, which acts as a carrier for active chemical compounds that react with the deposits, is generated in specialised foam-producing units. It completely fills the spaces being cleaned, ensuring uniform contact between the solvent and all surfaces being treated. Throughout the process, fresh (unreacted) foam is continuously injected into the turbine interior through the individual valve assemblies. At the outlet to the cold reheat line, the foam is “collapsed” into liquid form, allowing the reacted wastewater containing the removed deposits to be easily drained from the turbine. The appearance of fresh foam and a schematic of its flow through the turbine being cleaned are shown in Fig. 2.

Upon completion of the operation, the interior of the turbine is rinsed with chemically neutral foam generated from condensate, followed by saturated steam, until all residues of the chemicals used have been completely removed. All operations involving the introduction of foam into the turbine, saturated steam rinsing and the collection of process wastewater require a detailed plan of preparatory work. This plan must cover foam injection, protection against foam leaks into unintended areas, and the collection and removal of process wastewater.

During cleaning, the turbine remains on the turning gear, while the internal temperature is maintained at 70–90°C. The technology also involves monitoring the process through chemical measurements.

5. Scope of work carried out on TG 10 as part of the chemical foam cleaning process

The contract for cleaning parts of the 18K370 steam turbine’s WP (high-pressure) section at Unit 10 of PGE GiEK SA’s Bełchatów Power Station was awarded to Ecol Sp. z o.o. of Rybnik.

As part of the preparatory work, a team of engineers from Ecol Sp. z o.o., assisted by specialists from the Bełchatów Power Station, carried out a site inspection of the TG10 turbine in order to draw up the technical documentation for the process. The documentation covered the detailed layout of utility connection points, including: the extraction of process steam, condensate extraction, foam connections to the WP valve blocks, barrier air connections to the WP steam glands, connections for the ventilation of ammonia vapours from the process, and drainage and waste water connections.
The documentation included guidelines regarding: the carrying out of relevant dismantling work (components of the WP valve blocks, components of the cold bus check valves; selected flanges on the WP turbine drainage system) and the locations for making temporary process cuts (and welding in nozzles) on the turbine drainage system. The technical documentation included a discussion of the chemicals used, as well as the logistics relating to the media, equipment, wastewater and measurements to be carried out.

The detailed schedule set out the scope of work to be carried out by the Contractor
and the Client. Following appropriate consultations and agreements between the Contractor and the Client regarding the technology to be used and the expected results, preparations for the provision of the service began. The parties began preparations for carrying out the tasks: Ecol Sp. z o.o. prepared all the equipment required to carry out the work – foam-generating units and their accessories; media distribution hose systems; tank systems for the logistics of fresh and used chemicals; a laboratory for on-site monitoring of the process, and a full set of chemicals for foam generation and neutralisation. Adapters were also fabricated for all media connections to the turbine.

A key aspect of the technology was to prevent foam from escaping (leaking) beyond the areas being washed (i.e. leaks outside the outer hull of the WP through the shaft seals and leaks towards the condenser) as the chemicals used to remove deposits had a corrosive effect on brass and could damage the condenser components. Furthermore, efforts were concentrated on eliminating vapour leaks from the process, as these contained ammonia and could be a nuisance, or even hazardous, to people in the vicinity of the work.

The power station carried out the dismantling, machining and welding of the connections in-house, in accordance with the agreed technical documentation. As the SP-section rotor had been removed from the turbine and it was necessary to keep the turbine on the turntable, the power station fitted a special ‘end piece’ – an extension of the WP rotor acting as the journal of the thrust and support bearing (shown in photograph no. 1) – which enabled the WP rotor, housed within the inner and outer casings, to be rotated stably by the turntable. The oil system was adapted to supply the bearings required for rotating the WP rotor (the remaining supply lines were appropriately capped).

The Contractor connected all the necessary connections to the turbine’s WP section, prepared as described, to enable the ‘foaming’ process. The foam generation station was situated at elevation 0 m beneath the turbine, whilst the chemical dosing station and waste water tanks were located outside the engine room (Fig. 2)

Fig. 1. Shaft extension where the SP component’s rotor has been removed

The contractor connected all the necessary connections to the turbine’s WP (high-pressure valve) section, prepared in this way, to enable the ‘foaming’ process. The foam generation station was situated at elevation 0 m beneath the turbine, whilst the chemical dosing station and waste water tanks were located outside the engine room (Fig. 2)

5.1. Timeline

Days 1–2.

It took the Contractor two working days to complete all connections to the utility sources and to connect the units to the turbine, to position the chemical tanks and to mix the chemical solution for the production of chemically active foam in the tanks. At the end of the second day of work, the process of heating the turbine began using saturated steam fed into the turbine via the foam injection connections, and the rotator was switched on.

Day 3

On the third day, once the turbine had reached the required temperature, a leak test was carried out on the connection system and the operation of the foam-generating and fire-extinguishing units by introducing foam into the turbine that was produced solely from condensate (i.e. chemically neutral). The process parameters (flow rates, pressures, temperatures, etc.) were set. After checking against the checklist that all connections were leak-free and that the foam flow was proceeding correctly, the introduction of chemical foam intended for the actual process of cleaning the turbine of deposits was commenced.

Immediately after the introduction of the chemical cleaning foam, the process effluent, having passed through the WP (high-pressure) turbine, changed colour from transparent to an intense blue, indicating that a chemical reaction was taking place between the chemicals and the copper compounds present in the areas being cleaned (as shown in photograph 3).

Fig. 3. Appearance of wastewater samples from the cleaning process, taken during the initial stage of foam cleaning

W trakcie całego procesu czyszczenia chemicznego na bieżąco monitorowano takie parametry jak:

  • temperatura pary
  • temperatura w kole regulacyjnym turbiny
  • konsystencja piany
  • skład chemiczny piany po czyszczeniu
  • bilans przepływów piany i ścieków
  • efektywność „gaszenia” piany
  • szczelność całego układu i instalacji
  • poprawność działania agregatów
  • ilość generowanych ścieków

W celu bieżącej kontroli i oceny przebiegu efektywności procesu czyszczenia pianą chemiczną systematycznie wykonywano pomiary próbek ścieków pobranych za mytą turbiną. Pomiary pozwoliły określić takie parametry jak:

  • temperatura
  • stężenie miedzi Cu [mg/l]
  • stężenie żelaza Fe [mg/l]
  • pH

Proces czyszczenia trwał ok. 5,5 godziny. Przebieg zawartości Cu w trakcie procesu przedstawia wykres 2.

Przebieg zawartości Cu w trakcie procesu
Figure 2. Cu content over the course of the process

In addition to copper (Cu), the samples also contained small concentrations of iron (Fe) at a maximum level of 20 ppm.

Once the active foam cleaning process had been completed – that is, once a flat trend in the copper content of the tested samples had been achieved and the entire prepared chemical solution had been used up – the next
stage – flushing the system with condensate-based foam. The purpose of flushing the system with condensate-based foam was to remove any residues and chemicals from both the cleaned WP (high-pressure) turbine component and the auxiliary system.

Days 4–6

Once the condensate-based foam flush had been completed, the foam-generating unit was switched off. The next stage began – the final flush of the system with saturated steam, which lasted 2 days. All turbine drains were opened, and the introduction of saturated steam began. Samples of the condensate were taken internally on an ongoing basis and its conductivity was tested after it had passed through the system.

The saturated steam flushing process was continued until the conductivity of the condensate downstream of the turbine reached a level comparable to that of the condensate from the steam at the turbine inlet (the appearance of the condensate is shown in photograph no. 4).

Measurements of the quality of the blowdown steam and condensate were carried out by the Contractor and verified by the In-house Laboratory at the Bełchatów Power Station. The following parameters were measured:

  • condensate conductivity
  • pH
  • ammonia content
  • iron oxide content

Once the required parameters had stabilised, the acceptance committee decided to terminate the steam flushing process. All components of the steam flushing system, the barrier air system for the gland seals, the turbine cooling air system, the drainage system, etc., were dismantled; the work site was tidied up and the waste was neutralised.

On the seventh day of the works, the Contractor completed the works and left the Power Station site. The temporary connections and dismantled components were restored by the Bełchatów Power Station maintenance team to the operational configuration appropriate for the turbine.

6. Results of the work

  1. 1. The average concentration of copper (Cu) measured in the process effluent sample was approximately 495 [mg/l]. The effluent contained trace amounts of iron.
  2. 2. The amount of copper removed from the cleaned WP turbine, calculated on the basis of the concentrations, was approximately 8.11 kg. It can be concluded that the chemical cleaning method using active foam enabled the removal of copper compound deposits from the WP components of the 18K370 steam turbine on TG10.
  3. 3. Analysis of the trend in Cu concentration in the effluent confirmed that switching the foam flow through the individual fresh steam inlets to the turbine resulted in intensive leaching of copper compounds from the flushed sections of the steam inlet pipework between the valves and the turbine inlet. This is illustrated by the peaks in Cu concentrations visible and described in Figure 2.
  4. 4. The decontamination of the cleaned turbine from chemicals during the saturated steam flushing process was successful. The correct condensate parameters downstream of the turbine were achieved.
  5. 5. The work was carried out in accordance with the technical specifications and the arrangements between the Parties. The task was completed within the scheduled timeframe.

7. The impact of the foam cleaning carried out on the operating parameters of the TG10

On 10 November 2012, the TG10 turbine unit was recommissioned following refurbishment, having undergone foam cleaning of the flow path of the WP turbine.
After more than two months of operation, it can be concluded that, under comparable operating conditions, the pressure in the regulating wheel chamber has fallen to the level achieved following the major overhaul in 2008, when the WP flow system was mechanically cleaned of deposits by the turbine manufacturer.

Figure 3. Pressure curve in the control wheel chamber as a function of fresh steam flow rate.
Figure 4. Pressure drop curve across the WP section as a function of fresh steam flow rate.

8. Summary and conclusions

  1. 1. The pilot project at the Bełchatów Power Station – which was also the first foam cleaning operation carried out in Poland – proceeded in accordance with the plan at every stage.
  2. 2. No incidents posing a threat to human safety or the environment occurred during the works.
  3. 3. The identification of the causes of the turbine performance issues (i.e. the negative impact of deposits) proved to be correct.
  4. 4. The solution proposed by Ecol Sp. z o.o. of Rybnik, involving the chemical cleaning of the interior of the turbine’s WP section using chemical foam as a method allowing for the safe removal of Cu and Fe oxide deposits during short shutdowns, without removing the rotor from the WP housing and with the minimum possible dismantling work, met the expected criteria and can be recommended as an alternative to the traditional method of deposit removal following the dismantling of individual components in the event of a loss of expected performance.
  5. 5. In the case of turbines where the problem of deposit build-up recurs, the use of the chemical foam method may be considered as a means of preventatively restoring the turbine’s nominal capacity in the periods between major overhauls.
  6. 6. The frequency of preventative foam cleaning must be economically justified and will certainly be an individual (for a given turbine) result of many factors, such as: the rate at which performance deteriorates; lost production benefits due to deteriorated
  7. 7. In the above-mentioned case, consideration could be given to adapting the turbine for frequent cleaning by permanently leaving the connection ports for the chemical foam method fitted to the turbine. This would reduce the time taken to connect (and subsequently disconnect) the cleaning equipment, thereby shortening the turbine’s downtime. In such a case, the installation of the cleaning system could, for the most part, be carried out whilst the turbine is cooling down after being taken out of service.

contact

Do you have any questions about our turbine cleaning service?

Please contact us directly:

Brak połączenia z internetem

Nie udało się nawiązać połączenia z siecią. Upewnij się, że masz dostęp do internetu, a następnie odśwież stronę, aby kontynuować korzystanie z serwisu.