1. Introduction
Bełchatów Power Plant, owned by Polska Grupa Energetyczna (PGE), is the largest electricity producer in Poland. It is a lignite-fired power plant comprising 12 generating units with nominal capacities of 370–390 MW and one supercritical unit with a capacity of 858 MW.
Generating Units 1–12, commissioned between 1982 and 1988, use Dolmel Wrocław GTHW 360 MW synchronous generators (manufactured under a BBC licence) driven by Zamech Elbląg 18K360 steam turbines (manufactured under a BBC licence) to generate electricity.
Following upgrades to the LP sections (retrofits) of all 12 turbines carried out between 1997 and 2004, which resulted, among other things, in an increase in output of 10–12 MW, the turbine designation was changed from 18K360 to 18K370.
The main turbine installed at Unit 10 is a condensing, reaction-type, single-shaft, three-casing turbine with non-controlled steam extractions and intermediate steam reheating. Steam supply to the turbine is regulated using a combined throttling and quality control system operated by four control valves. The turbine consists of three sections: a high-pressure (HP) section, a double-flow intermediate-pressure (IP) section and a double-flow low-pressure (LP) section.
During the operation of turbines at Bełchatów Power Plant, systematic fouling of the flow paths in the high-pressure sections has been observed, characterised by elevated pressure in the control stage chamber. The increased pressure in this chamber indicates the presence of a thick layer of corrosion and operational deposits on the convex surfaces of the blade profiles in the HP blading assemblies.
As the accumulation of deposits leads to a noticeable deterioration in turbine performance, the plant’s engineering staff undertook efforts to identify and implement a method for removing deposits from the turbine quickly and effectively. The objectives set for the proposed solution included selecting a method that would safely remove deposits consisting predominantly of copper and iron oxides during short maintenance outages, without removing the rotor from the HP casing and with the minimum possible scope of dismantling work. The solution selected was proposed by Ecol Sp. z o.o. of Rybnik and involved chemical cleaning of the interior of the turbine’s HP section using chemical foam.
In September 2012, a pilot chemical foam cleaning operation was carried out on the HP section of the 18K370 turbine at Unit 10 of PGE Górnictwo i Energetyka Konwencjonalna S.A., Bełchatów Power Plant Branch. This paper presents the experience gained during the work and the results obtained.